Water Supply


Fee Description   2018/19
All schemes excluding rural water supplies    
Metered water supply three monthly charges:
15mm to 20mm $ 165.00
25 mm $ 175.00
32 mm $ 175.00
40 mm $ 186.00
50 mm $ 186.00
100 mm $ 216.00
150 mm $ 237.00
The above charges include an allowance of 380m3 of water per annum. Water use in excess of this will be separately charged.
Additional water use per m3 $ 1.45
RPZ (Reduced Pressure Zone Protector) inspection and test fee for meters up to 50 mm $ 114.00
RPZ (Reduced Pressure Zone Protector) inspection and test fee for meters larger than 50 mm $ 175.00
Emergency meters water use per m3 (minimum charge of $20.00 applies when water is used) $ 5.36
     
Connection fees - per connection    
New connection to property boundary As charged by Contractor
PLUS MDC Administration Fee $ 285.00
     
Disconnection fees    
Pipe diameter up to 20 mm $ 465.00
     
Meter installation cost in addition to manifold costs    
Sizes up to 20 mm $ 325.00
Sizes greater than 20 mm Individual quote
     
Service restriction due to account issues (disconnect and reconnect)    
Remove or replace flow restrictor $ 390.00
     
Capital Contributions - Units of Demand    
Himatangi Beach $ 4,120.00
Feilding fringe $ 6,290.00
     
Stanway/Halcombe Rural Water Scheme    
Capital contribution (per unit) $ 3,100.00
Connection fee (owner pays all pipe work) $ 1,325.00
Disconnection $ 465.00
Remove or replace flow restrictor $ 390.00
Increase or decrease water allocation $ 390.00
     
Waituna West Rural Water Scheme    
Capital contribution (per unit) $ 3,785.00
Connection fee (owner pays all pipe work) $ 1,325.00
Disconnection $ 465.00
Remove or replace flow restrictor $ 390.00
Increase or decrease water allocation $ 390.00
     
Sanson Water Scheme    
Capital contribution (per unit) $ 5,310.00
Connection fee $ 1,325.00
Disconnection $ 465.00
Remove or replace flow restrictor $ 390.00
Increase or decrease water allocation $ 390.00
     
Turners Road Water Filling Station    
Water use per m3 $ 2.25
Access key (refundable deposit) $ 55.00
     
Rongotea Water Scheme    
Capital contribution (per unit) $ 7,265.00
Connection fee $ 1,325.00
Disconnection $ 465.00