Check us out on Neighbourly
Follow us on Instagram
Like us on Facebook
Send us an email

Water Supply

Fee Description   2019/20
All schemes (excluding rural water supplies)    
Metered water supply three monthly charges:
15mm to 20mm $ 174.00
25 mm $ 184.00
32 mm $ 184.00
40 mm $ 196.00
50 mm $ 196.00
100 mm $ 227.00
150 mm $ 249.00
The above charges include an allowance of 380m3 of water per annum. Water use in excess of this will be separately charged.
Additional water use per m3 $ 1.53
RPZ (Reduced Pressure Zone Protector) inspection and test fee for meters up to 50 mm $ 118.00
RPZ (Reduced Pressure Zone Protector) inspection and test fee for meters larger than 50 mm $ 181.00
Emergency meters water use per m3 (minimum charge of $20.00 applies when water is used) $ 5.52
     
Service restriction due to account issues (disconnect and reconnect)    
Remove or replace flow restrictor $ 402.00
     
Water Filling Stations    
Water use per m3 $ 2.37
Access key (refundable deposit) $ 60.00
     
Feilding Water    
Capital contribution (per unit of demand) - where development contributions are not charged $ 6,475.00
Connection fee:    
• New connection to property boundary PLUS MDC Administration Fee As charged by Contractor
• MDC Administration Fee $ 295.00
Meter installation cost in addition to manifold costs - sizes up to 20 mm $ 335.00
Meter installation cost in addition to manifold costs - sizes greater than 20 mm Individual quote
Disconnection - Pipe diameter up to 20mm $ 480.00
Disconnection - Pipe diameter over 20mm Individual quote
     
Himatangi Beach Water Scheme    
Capital contribution (per unit of demand) $ 4,245.00
Connection fee:    
• New connection to property boundary PLUS MDC Administration Fee As charged by Contractor
• MDC Administration Fee $ 295.00
Disconnection $ 480.00
     
Rongotea Water Scheme    
Capital contribution (per unit of demand) $ 7,480.00
Connection fee $ 1,365.00
Disconnection $ 480.00
Meter installation cost in addition to manifold costs - sizes up to 20 mm $ 335.00
Meter installation cost in addition to manifold costs - sizes greater than 20 mm Individual quote
     
Sanson Water Scheme    
Capital contribution (per unit of demand) $ 5,465.00
Connection fee $ 1,365.00
Disconnection $ 480.00
Remove or replace flow restrictor $ 400.00
Increase or decrease water allocation $ 400.00
     
Stanway/Halcombe Rural Water Scheme    
Capital contribution (per unit) $ 3,195.00
Connection fee (owner pays all pipe work) $ 1,365.00
Disconnection $ 480.00
Remove or replace flow restrictor $ 400.00
Increase or decrease water allocation $ 400.00
     
Waituna West Rural Water Scheme    
Capital contribution (per unit) $ 3,895.00
Connection fee (owner pays all pipe work) $ 1,365.00
Disconnection $ 480.00
Remove or replace flow restrictor $ 400.00
Increase or decrease water allocation $ 400.00