Feilding Trade Waste Separation
Manawatū District Council is working to separate industrial trade waste from domestic wastewater in Feilding, creating a more efficient and sustainable wastewater system.
Currently, industrial and household wastewater is managed through a shared network. As Feilding grows, this places increasing pressure on infrastructure and treatment processes.
The Trade Waste Separation Programme will introduce dedicated pipelines, pumping infrastructure and treatment improvements to allow industrial wastewater to be managed separately.
Why are we doing this?
Industrial wastewater can contain higher levels of nutrients and organic material than household wastewater, putting pressure on our treatment system.
By separating these waste streams, Council can manage wastewater more effectively, reduce pressure on existing infrastructure and support improved water quality in the Ōroua River.
The programme also creates opportunities to recover valuable resources from organic industrial waste and generate renewable energy.
Programme benefits
- Environmental protection: Improved nutrient management and wastewater treatment to support healthier waterways.
- Economic growth: Infrastructure that supports existing industries and future development in Feilding.
- Network resilience: Reduced pressure on shared wastewater infrastructure and improved treatment efficiency.
- Long-term value: More targeted infrastructure investment and reduced reliance on costly reactive upgrades.
- Resource recovery: Opportunities to convert organic waste into renewable energy and other useful products.
What's involved?
The programme includes installing dedicated trade waste pipelines, developing pump stations, upgrading treatment infrastructure at the Manawatū Wastewater Treatment Plant and working with industrial businesses to establish new trade waste arrangements.
Works will be delivered in stages, with opportunities to coordinate construction alongside other Council infrastructure projects.
Next steps
Council will continue progressing the design and delivery of trade waste infrastructure, working with industrial customers and investigating opportunities for renewable energy and resource recovery.
Further updates will be provided as the programme progresses, and construction timeframes are confirmed.